Toyota Material Handling Polska Sp. z o.o.

Investor: Toyota Material Handling Polska Sp. z o.o.
Type of building: Service and warehouse building with Design and Build part
Localisation: Jaktorów, ul. Potockiego
Total area: 7754 m2
Scope of works: Design and build

Description of investment:
The investment was carried out by Probis in full cycle: from consulting at the concept level by adjusting the concept to changing Investor's requirements, to design and obtaining construction permit, complex implementation, to obtaining permission to use.

Choosing this path of investment implementation allowed optimisation of design solutions adjusted to Investor's needs, but also taking into consideration technological solutions to meet very ambitious budget assumptions and short realisation time and creating a possibility for "unobstructed" development of the facility in planned 2nd phase, in both office and warehouse part. Assumption of the above methodology allowed implementation of the facility in 9 months (from start of works to obtaining permission to use the building). The facility has fully prefabricated construction, which allowed quick implementation in winter conditions and high quality. The roof was covered with PVC membrane (10 years warranty on the tightness of the roof), the walls are made of sandwich panels with polyurethane foam, plumbing and electricity solutions were optimized, high-quality materials were used. The result is a modern facility consisting of forklift carts service part with overhead crane, service pit, wash, telescopic lifts, warehouse part with loading area with ramps and gates, and the office part with flexible training section and canteen for employees in a high standard.


Year of construction: 2010/2011

Galery



List of Projects

HARPER HYGIENICS S.A.

P.H.U. ‘POLCAN’ ROMAN KWIATKOWSKI

Truck Support S.C.

START PM Sp. z o.o.

KSB Pompy i Armatura Sp. z o.o.

P.P.H. Normal Janusz Biernacki

SW Investments Sp. z o.o.

RIM Kowalczyk Sp. Jawna

AllSpice Sp. z o.o.

Mera Technik Sp. z o.o.

P.P.H.U. BREJNAK

Pattinvest Sp. z o.o.

EWT Truck & Trailer Polska Sp. z o.o.

Remo-Car Sp. z o.o.

Problem Sp. z o.o.

Montaż budynków prefabrykowanych

ARCON INDUSTRIAL SERVICE CORPORATION Sp. z o.o.

MATT Maciej Stachulski

BOGUCKI A. Bogucki, H. Bogucka Sp. Jawna

ROWIT Sp. z o.o.

P.H.U. AGA-POL Sławomir Pawlak

BUKAT

STARK PARTNER Sp. z o.o.

SBP International Transport S.C.

OVENTROP Sp. z o.o.

SERWIS GAZ Sp. z o.o.

TIRSPED Sp. z o.o.

ASIA FOODS Sp. z o.o.

EKONIP Sp. z o.o.

FIRMUSS S.J. Zbigniew Chartonowicz

MAXIPLAST Zbigniew Zasikowski

Good Work Polska Sp. z o.o.

ZPR Miropasz M. Wiczyński

KACPEREK Mechanika Maszyn

Horizont Rolos Sp. z o.o.

Curver Poland Sp. z o.o.

AGD Pasterski

Danfoss Poland Sp. z o.o.

KORMET Cezary Sibiński

Bioelektra Sp. z o.o.